The Haugen Development
Summary
The Haugen Development is a proposal to subdivide 1.3 acres into 4 lots using infill provisions of Poulsbo Municipal Code (PMC) opens in a new window18.70.070.P. The proposal includes (3) lots fronting Haugen Street, ranging from 5,100-5,200 square feet. The remaining (4th) parent lot will retain the existing home and detached garage. Access to all lots will be from Haugen Street. Street curbing, driveway access, and two on-street parking spaces are proposed in addition to 2 required parking spaces on each new lot. The application identifies building façade along Haugen Street will be limited to 20.6 feet in height, which is the calculated average building façade height of existing homes fronting the street.
Applicable Code Sections (not all inclusive)
- PMC opens in a new windowChapter 18.70, Residential Districts
- PMC opens in a new window18.70.070 P, Infill Residential Development Standards
- PMC opens in a new windowChapter 18.230, Conditional Use Permits
- PMC opens in a new windowChapter 17.40, Short Subdivision
- PMC opens in a new windowChapter 16.20, Critical Areas
Project Documents
- opens in a new windowPC Findings and Recommendationopens PDF file
- opens in a new windowStaff Reportopens PDF file and opens in a new windowExhibitsopens PDF file (for March 2 Planning Commission Public Meeting)
- opens in a new windowPublic Comment Matrixopens PDF file – prepared by city staff
- opens in a new windowEngineering Department Memoopens PDF file
- opens in a new windowProject Narrativeopens PDF file , including architectural renderings (revised Jan 2021)
- opens in a new windowSite Drawingopens PDF file
- Short Plat Drawings – opens in a new windowpage 1opens PDF file and opens in a new windowpage 2opens PDF file and opens in a new windowPage 3opens PDF file
- Application – opens in a new windowShort Platopens PDF file and opens in a new windowACUP Questionsopens PDF file
- opens in a new windowBuilding Height Memoopens PDF file and opens in a new windowBlock Face Building Height Calcsopens PDF file
- opens in a new windowSEPA Checklistopens PDF file
- opens in a new windowCritical Area Reportopens PDF file and opens in a new windowMemorandumopens PDF file
- opens in a new windowPreliminary Storm Drainage Reportopens PDF file
- opens in a new windowDrainage Utilities Planopens PDF file
- opens in a new windowApplicant Response to Neighborhood Meeting Public Commentsopens PDF file
- Site Plan
- Short Plat
Project Timeline
- Pre-Application Conference: opens in a new windowMay 7, 2019opens PDF file
- Neighborhood Meeting: opens in a new windowJuly 31, 2019opens PDF file
- Technically Complete and Request for Revisions: August 10, 2020opens PDF file
- Notice of Application: opens in a new windowAugust 10, 2020opens PDF file
- Resubmittal of Revisions: July 27, 2020, September 9, 2020, October 28, 2020, and November 23, 2020
- Planning Commission Public Meeting – opens in a new windowMarch 2, 2021opens PDF file
Note: SEPA review is not required for this project per opens in a new windowWAC 197-11-80(6)(d)
Staff Contact
Edie Berghoff | eberghoff@cityofpoulsbo.comcreate new email | 360.394.9748