Pinnacle at Liberty Bay Planned Residential Development and Preliminary Plat
Overview
Pinnacle at Liberty Bay is a proposed Subdivision and Planned Residential Development (PRD) located on approximately 42 acres in the Residential Low (RL) zone of Poulsbo. The site is situated between the existing Crystal View and Baywatch neighborhoods. Physical characteristics of the property include a mix of gentle to steep slopes, second- and third-growth forest consistent with historical logging activity, several wetlands, and three stream segments or drainages. The proposal includes 151 single-family residential lots, along with associated infrastructure such as internal roads, open space, stormwater management facilities, and preservation of critical areas and required buffers. Vehicular access is proposed via two points on State Route 305: Baywatch Court NE on the west and Johnson Parkway NE on the east. The development also proposes to complete a segment of Sunrise Ridge Avenue NE, connecting to the Johnson Parkway NE roundabout, which would establish a continuous east-west connection and improve access for public and emergency services in the area.
Quick Facts
General Project Summary
-
Project Name: Pinnacle at Liberty Bay
-
Location: Between Crystal View and Baywatch developments in Poulsbo, WA
-
Site Size: ~42 acres over 4 parcels
-
Zoning: Residential Low (RL)
-
Development Type: Preliminary Subdivision + Planned Residential Development (PRD)
- Mix of “daylight”, “tuck-under”, and “flat” lots with 151 detached single-family homes
-
Average Lot Size: ~4,962 square feet. Smallest Lot Size: 3,398 square feet
Open Space and Amenities
-
Tree Retention: 840 significant trees retained (exceeds 25% requirement). Tree Retention to be peer reviewed.
-
Open Space Tracts: Multiple tracts throughout the site providing passive and active space
-
Parks: Includes several small parks distributed across the three phases
-
Trails: Soft-surface trails connect open spaces and follow critical areas
Traffic and Access
-
Primary Access Points: Baywatch Ct NE (west), Johnson Parkway NE (east), Completion of Sunrise Ridge Avenue NE (internal arterial connection)
-
Trip Generation: AM Peak: 114 trips, PM Peak: 151 trips
- TIA to be peer reviewed
Stormwater Facilities:
-
Multiple storm ponds located throughout the site
-
Designed per 2019 SWMMWW (Stormwater Manual for Western Washington)
- Stormwater Report to be peer reviewed
Critical Areas
-
Streams and Wetlands: Several on site (Streams A–D, Wetlands A–D)
- Habitat Management Plan to be peer reviewed
Project Documents
Technical Review
- Counter Complete Letter – Sent 7/18/25
- Technically Complete Letter– Sent 8/14/25
- Request for Revisions Technical Review No. 1 – Sent 9/8/25
- Habitat Management Plan Peer Review
- Arborist Report Peer Review
- TIA Peer Review
- Stormwater Peer Review – coming soon
- Geotech Peer Review – coming soon
- Water Modeling Peer Review – coming soon
- Combined Pinnacle NOA Comment Received (provided to applicant)
July 2025 - Application Submittal
- Preliminary Subdivision Application Form
- Planned Residential Development Application Form
- Critical Areas Review Application Form
- Cover Letter
- PRD Narrative
- General Site Plans
- Landscape and Open Space Plans
- Tree Retention Arborist Report
- Grading Plans
- Utility and Street Plans
- Stormwater Report
- Geotechnical Report West and East
- Buffer Mitigation Plan and Habitat Management Plan
- Traffic Impact Analysis and Concurrency Application
- SEPA Checklist (not yet reviewed by staff)
- Individual Identity Plan and Preliminary Elevations
Public Notices
- Notice of Application (8/27/25-9/11/25)
- Public comment received during Notice of Application comment period (provided to applicant)
- Notice of SEPA Determination
- Notice of Planning Commission Public Meeting
- Notice of Hearing Examiner Public Hearing
SEPA
Staff Report
Public Comments Received
Project Timeline
Consistent with PMC Title 19, Project Permit Application Procedures for a Type III Application – Note: This is Step 2 in a 6-Step Review Process for Subdivisions
Pre-Application Conference 1 | November 5, 2024 |
Pre-Application Conference 2 | April 10, 2025 |
Neighborhood Meeting | April 21, 2025 |
Application Submittal Counter Complete | July 28, 2025 |
Technically Complete | TBD (required within 28 days of counter complete) |
Notice of Application Issued (14-Day Comment Period) | TBD (required within 14 days of technically complete) |
Technical Review No. 1 | TBD |
Request for Revisions Provided to Application | TBD |
Technical Review No. 2* | TBD |
Request for Revisions Provided to Application | TBD |
SEPA Determination Issued (14-Day Comment Period) | TBD |
Notice of Planning Commission Public Meeting Issued | TBD |
Planning Commission Staff Report Issued | TBD |
Planning Commission Public Meeting | TBD |
Notice of Hearing Examiner Public Hearing Issued | TBD |
Notice of Hearing Staff Report Issued | TBD |
Hearing Examiner Public Hearing | TBD |
Hearing Examiner Decision | TBD |
Request for Reconsideration | TBD |
Notice of Decision Issued | TBD |
Appeal Period | TBD |
* Additional technical review cycle may be required. TBD.
Email Notification
If would like to be notified of public notices for this project by email, we welcome you to sign up here.