Notices

  • Road Detours – Langaunet Lane NE and Maranatha Lane NE
    • A road detour at Langaunet Lane NE is currently in place.
    • A road detour at Maranatha Lane NE is currently in place.

Project Description

This roadway improvements project includes a roundabout at the intersection of NE Mesford Road and Noll Road, and extends from NE Mesford Road to NE Lincoln Road along Langaunet Lane NE and Maranatha Lane NE. Roadway illumination, sidewalk, and a shared-use path are also components of this new road.  In addition to the Langaunet to Maranatha roadway improvements, this project along Noll Road will include a sidewalk and shared-use path to NE Bjorn Street and Poulsbo Elementary School. Raised crosswalks will provide traffic calming and enhanced pedestrian safety by increasing the visibility and level of awareness of a preferred pedestrian crossing. The project was designed to create safe and accessible routes for vehicle, bike, and pedestrian traffic while meeting complete street goals.

  • NORTH SEGMENT (from NE Mesford Road to NE Lincoln Road) 
    • Includes Langaunet Lane NE – Kevos Pond Ct NE – Maranatha Lane
  • MIDDLE SEGMENT (Noll Road from Johnson Parkway NE to NE Bjorn)
    • Pedestrian Entrance to Poulsbo Elementary

NORTH SEGMENT: NE Mesford Road TO NE Lincoln Road

(Langaunet Lane NE – Kevos Pond CT NE – Maranatha Lane NE)

This phase of the project will include the following improvements:

  • New paved travel lanes
  • A storm drain system
  • Sidewalks
  • Shared-Use path
  • Landscape/planting strip
  • Illumination
  • Compacted roundabout at intersection of Mesford Road and Noll Road
  • Raised crosswalks to provide traffic calming and enhanced pedestrian safety

MIDDLE SEGMENT: Noll Road from Johnson Parkway NE to NE Bjorn Street

This phase of the project will include the following improvements:

  • Road improvements
  • Installation of sidewalks
  • Continuation of Shared-Use Path
  • Illumination
  • New 10′ wide sidewalk connecting Noll Road to Poulsbo Elementary School

What to Expect

  • Construction began on Monday, May 5, 2025
  • Work hours are 7:00 am to 7:00 pm
  • Heavy equipment and typical construction noise and vibration from equipment
  • Limited road closures and access to roadways will be maintained
  • Construction is expected through summer 2026

Thank you for your patience and understanding throughout this project.

Project Contractor Timeline

*  Please note that this is only an estimated timeline and dates are subject to change. This schedule will be updated regularly, so please check back as the project moves forward.

  • A road detour at Maranatha Lane NE is currently in place through October 24.
  • A road detour at Langaunet Lane NE is currently in place through October 29.
  • Installation of illumination is ongoing through the month of October.
  • Installation of the stormwater system/water is ongoing through the end of October.
  • Landscaping Langaunet Lane is scheduled to start late October.
  • Landscaping near Poulsbo Elementary School is scheduled to begin mid-October.
  • Pouring of curbs and gutters to take place on Maranatha Lane the first week of November, weather dependent.

Public Meetings

A Neighborhood Open House took place on Thursday, April 17, 2025 at City Hall for project managers to meet with citizens to introduce the project team, discuss the project and potential impacts to the community, and answer questions. To view the PowerPoint presentation, click HERE.

Noll Road Construction Photos

April 2025- Mesford & Langaunet

June 2025- Mesford & Langaunet

August 2025- Mesford & Langaunet

April 2025- Noll & Mesford Intersection

June 2025- Noll & Mesford Intersection

August 2025- Noll & Mesford Intersection

June 2025- Noll Road (Middle Segment)

August 2025- Noll Road (Middle Segment)

June 2025- Maranatha Lane

September 2025- Maranatha Lane

August 2025- Langaunet Lane

 

 

 

 

 

 

 

 

 

 

 

September 2025- Langaunet Lane

June 2025- Poulsbo Elementary School

 

 

 

 

 

 

 

 

August 2025- Poulsbo Elementary School Sidewalk & Driveway

CONTACT US

CITY ENGINEER / PROJECT MANAGER:
JOSH RANES, P.E.
360.394.9736
jranes@cityofpoulsbo.com

ASSISTANT PROJECT MANAGER:
JOY ANGSIOCO, P.E.
360.394-9739
jangsioco@cityofpoulsbo.com

Or you may contact the City of Poulsbo Engineering staff at EngineeringDept@cityofpoulsbo.com if you have any questions. Thank you for your interest in this project!