Notices

  • An open house for the Noll Road Corridor Improvements Project – Middle Segment is scheduled to take place on Tuesday, March 3, 2026, from 5:00-6:00 PM in the City Hall Council Chambers. During the open house, the project managers will provide an overview of the upcoming work and allow time for questions regarding the project. This phase includes the section between Hostmark Street and Mesford Road.

Project Upcoming Work

*  Updated 02/05/26. Please note that this is only an estimated timeline and dates are subject to change. This schedule will be updated regularly, so please check back as the project moves forward.

  • The intersection of Noll Road and Mesford Road has now been delineated as a roundabout while the contractor works to construct the center island. All motorists should proceed through this intersection as a roundabout and yield to other motorists in the roundabout.
  • Pouring of sidewalks and ramps along Kevos Pond and Maranatha Lane to take place the week of February 2, with driveways being poured the week of February 9 (weather dependent). This includes the installation of ADA ramps.
  • Noll/Mesford grading and pouring of the mountable curb at the roundabout to begin the week of February 9 (weather dependent).
  • Noll/Mesford grading and pouring of the concrete truck apron to take place the week of February 16 (area between the road portion of the roundabout and the inner circle of the roundabout).
  • Noll/Mesford grading and pouring curbs and sidewalks to take place near the end of February (weather dependent).
  • Ongoing installation of the irrigation system and roadway illumination.

Project Description

This roadway improvements project includes a roundabout at the intersection of NE Mesford Road and Noll Road, and extends from NE Mesford Road to NE Lincoln Road along Langaunet Lane NE and Maranatha Lane NE. Roadway illumination, sidewalk, and a shared-use path are also components of this new road.  In addition to the Langaunet to Maranatha roadway improvements, this project along Noll Road will include a sidewalk and shared-use path to NE Bjorn Street and Poulsbo Elementary School. Raised crosswalks will provide traffic calming and enhanced pedestrian safety by increasing the visibility and level of awareness of a preferred pedestrian crossing. The project was designed to create safe and accessible routes for vehicle, bike, and pedestrian traffic while meeting complete street goals.

  • NORTH SEGMENT (from NE Mesford Road to NE Lincoln Road) 
    • Includes Langaunet Lane NE – Kevos Pond Ct NE – Maranatha Lane
  • MIDDLE SEGMENT (Noll Road from Johnson Parkway NE to NE Bjorn)
    • Pedestrian Entrance to Poulsbo Elementary

NORTH SEGMENT: NE Mesford Road TO NE Lincoln Road

(Langaunet Lane NE – Kevos Pond CT NE – Maranatha Lane NE)

This phase of the project will include the following improvements:

  • New paved travel lanes
  • A storm drain system
  • Sidewalks
  • Shared-Use path
  • Landscape/planting strip
  • Illumination
  • Compacted roundabout at intersection of Mesford Road and Noll Road
  • Raised crosswalks to provide traffic calming and enhanced pedestrian safety

MIDDLE SEGMENT: Noll Road from Johnson Parkway NE to NE Bjorn Street

This phase of the project will include the following improvements:

  • Road improvements
  • Installation of sidewalks
  • Continuation of Shared-Use Path
  • Illumination
  • New 10′ wide sidewalk connecting Noll Road to Poulsbo Elementary School

What to Expect

  • Construction began on Monday, May 5, 2025
  • Work hours are 7:00 am to 7:00 pm
  • Heavy equipment and typical construction noise and vibration from equipment
  • Limited road closures and access to roadways will be maintained
  • Construction is expected through summer 2026

Thank you for your patience and understanding throughout this project.

Public Meetings

A Neighborhood Open House took place on Thursday, April 17, 2025 at City Hall for project managers to meet with citizens to introduce the project team, discuss the project and potential impacts to the community, and answer questions. To view the PowerPoint presentation, click HERE.

Noll Road Construction Photos

April 2025- Mesford & Langaunet

June 2025- Mesford & Langaunet

August 2025- Mesford & Langaunet

October 2025- Mesford & Langaunet

April 2025- Noll & Mesford Intersection

June 2025- Noll & Mesford Intersection

August 2025- Noll & Mesford Intersection

June 2025- Noll Road (Middle Segment)

August 2025- Noll Road (Middle Segment)

June 2025- Maranatha Lane

September 2025- Maranatha Lane

April 2025- Maranatha & Lincoln Intersection

September 2025- Maranatha & Lincoln Intersection

August 2025- Langaunet Lane

 

 

 

 

 

 

 

 

 

 

 

September 2025- Langaunet Lane

June 2025- Poulsbo Elementary School

 

 

 

 

 

 

 

 

August 2025- Poulsbo Elementary School Sidewalk & Driveway

CONTACT US

CITY ENGINEER / PROJECT MANAGER:
JOSH RANES, P.E.
360.394.9736
EMAIL

ASSISTANT PROJECT MANAGER:
JOY ANGSIOCO, P.E.
360.394-9739
EMAIL

Or you may contact the City of Poulsbo Engineering staff at EMAIL if you have any questions. Thank you for your interest in this project!